Documentary record
Plataforma Biquara 1 (PBIQ-01)
Plataforma Biquara 1 (PBIQ-01), fixed platform operated by Petrobras, Potiguar Basin: under decommissioning (ANP); 206 t declared in the PDI.
- Type
- Fixed platforminferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
- Field
- BIQUARAView source · Reviewed: 11/27/2026
- Basin
- PotiguarView source · Reviewed: 11/27/2026
- Operator
- PETROBRASView source · Reviewed: 11/27/2026
- ANP status
- Under decommissioningView source · Reviewed: 11/27/2026
- Coordinates
- -4.857, -36.5605View source · Reviewed: 11/27/2026
- Documented acronyms
- PBIQ-01View source · Reviewed: 11/27/2026
Location
- Under decommissioning1
- Awaiting decommissioning0
- Hibernation0
- Decommissioned0
- Operating0
- Life extension0
- Not provided0
Coordinates and statuses
| Platform | Status | Latitude | Longitude |
|---|---|---|---|
| PLATAFORMA BIQUARA 1 | Under decommissioning | -4.857 | -36.5605 |
Timeline
A chronology of documented events.
Operation, production, approvals and destinations. Markers retain the precision stated in the source.
How to read this timeline
This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.
Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.
Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.
One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.
ANP proceedings
| SEI proceeding | PDI / installation | Modality | Status | PDI approval | RDI approval | Source |
|---|---|---|---|---|---|---|
| 48610.222226/2023-11 | PLATAFORMA BIQUARA 1 | Executive | Approved | 11/7/2025 | Not provided | View source · Reviewed: 11/27/2026 |
Mass declared in the PDI
Mass declared in the PDI
- Mass in decommissioning condition (lightweight)
- 206 t
- Public PDI source
- Open PDI source
- Page in the PDI
- 22
- PDI retrieval date
- 11/27/2026
PDI observation: Jacket 180 t (including conductor, piles, grout and fouling) + deck 26 t.
Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.
Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.
Declared mass; not recoverable steel.
Explore the connections
Same field
Closest declared masses
Sources
- ANP - Dynamic Panel for Decommissioning E&P Facilities · Reviewed: 11/27/2026
- pdi-executivo-plataforma-biquara-01.pdf · Reviewed: 11/27/2026