Naval ObservatoryOffshore Brazil

Documentary record

Plataforma de Dourado 2

Plataforma de Dourado 2, fixed platform operated by Petrobras, Sergipe Basin: awaiting decommissioning (ANP); 373 t declared in the PDI.

Use in a study
Type
Fixed platforminferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
Field
DOURADOView source · Reviewed: 11/27/2026
Basin
SergipeView source · Reviewed: 11/27/2026
Operator
PETROBRASView source · Reviewed: 11/27/2026
ANP status
Awaiting decommissioningView source · Reviewed: 11/27/2026
Coordinates
-11.1148, -36.9666View source · Reviewed: 11/27/2026
Documented acronyms
Not providedView source · Reviewed: 11/27/2026

Location

Map of the 1 platforms in the ANP panelOriginal ANP coordinates; platforms in the PDI supplement are not shown on this map. Each point provides a name, status and coordinates.PLATAFORMA DE DOURADO 2 · Awaiting decommissioning · latitude -11.1148 · longitude -36.9666© OpenStreetMap
  • Under decommissioning0
  • Awaiting decommissioning1
  • Hibernation0
  • Decommissioned0
  • Operating0
  • Life extension0
  • Not provided0
1 ANP coordinates · no PDI supplement pointsSource: ANP panelSnapshot: Nov 27, 2026
Coordinates and statuses
Original coordinates from the ANP panel
PlatformStatusLatitudeLongitude
PLATAFORMA DE DOURADO 2Awaiting decommissioning-11.1148-36.9666

Timeline

SOURCED EVENTS

A chronology of documented events.

Operation, production, approvals and destinations. Markers retain the precision stated in the source.

How to read this timeline

This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.

Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.

Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.

Today: 11/27/20261 platforms · 1 events on the axis · 0 periods without a single date
Documented events from 1975 to 2035, grouped by basin or operator
Platform
1975198019851990199520002005201020152020202520302035Today
Period without a single date
Awaiting decommissioning
Review 1 events for PLATAFORMA DE DOURADO 2
PLATAFORMA DE DOURADO 2
ANP - Dynamic Panel for Decommissioning E&P FacilitiesSEI proceeding: 48610.208338/2024-313 rows repeat this combination of platform, proceeding and date; one marker is shown.
—
Start of operationsProduction cessation, actualCessation forecast in the PDI · operator forecastPDI approvedRDI approved · No records in this selectionDocumented destination

One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.

ANP proceedings

SEI proceedingPDI / installationModalityStatusPDI approvalRDI approvalSource
48610.208338/2024-31PLATAFORMA DE DOURADO 1ExecutiveApproved10/13/2025Not providedView source · Reviewed: 11/27/2026
48610.208338/2024-31PLATAFORMA DE DOURADO 2ExecutiveApproved10/13/2025Not providedView source · Reviewed: 11/27/2026
48610.208338/2024-31PLATAFORMA DE DOURADO 3ExecutiveApproved10/13/2025Not providedView source · Reviewed: 11/27/2026

Mass declared in the PDI

Mass declared in the PDI

Declared in the PDI
Mass in decommissioning condition (lightweight)
373 t
Public PDI source
Open PDI source
Page in the PDI
19
PDI retrieval date
11/27/2026

PDI observation: Sum of jacket, conductors and deck; pipelines and risers are excluded.

Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.

Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.

Declared mass; not recoverable steel.

Explore the connections

Sergipe Basin · Petrobras

Same field

Closest declared masses

Sources

Sources and method