Documentary record
P-37
P-37 (Petrobras 37), FPSO operated by Petrobras, Campos Basin: public PDI, not in the ANP panel table; production ceased in 2019.
Outside the ANP panel’s platform table · source: PDI
- Type
- FPSOdeclared in the PDIView source · Reviewed: 11/27/2026
- Field
- MARLIMView source · Reviewed: 11/27/2026
- Basin
- CamposView source · Reviewed: 11/27/2026
- Operator
- PETROBRASView source · Reviewed: 11/27/2026
- ANP status
- Not providedView source · Reviewed: 11/27/2026
- Coordinates
- Not providedView source · Reviewed: 11/27/2026
- Documented acronyms
- Not providedView source · Reviewed: 11/27/2026
Timeline
A chronology of documented events.
Operation, production, approvals and destinations. Markers retain the precision stated in the source.
How to read this timeline
This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.
Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.
Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.
One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.
ANP proceedings
| SEI proceeding | PDI / installation | Modality | Status | PDI approval | RDI approval | Source |
|---|
No proceeding linked in this review.
Mass declared in the PDI
Not provided
Declared mass; not recoverable steel.
Explore the connections
Same field
Sources
- pdi-executivo-fpso-37-parte1-1.pdf · Reviewed: 11/27/2026