P-20

P-20 (Petrobras 20), semi-submersible operated by Petrobras, Campos Basin: under decommissioning (ANP); production ceased in 2022; 15,935 t declared in the PDI.

Use in a study
Type
Semisubmersibleinferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
Field
MARLIMView source · Reviewed: 11/27/2026
Basin
CamposView source · Reviewed: 11/27/2026
Operator
PETROBRASView source · Reviewed: 11/27/2026
ANP status
Under decommissioningView source · Reviewed: 11/27/2026
Coordinates
-22.3591, -40.0891View source · Reviewed: 11/27/2026
Documented acronyms
Not providedView source · Reviewed: 11/27/2026

Location

Map of the 1 platforms in the ANP panelOriginal ANP coordinates; platforms in the PDI supplement are not shown on this map. Each point provides a name, status and coordinates.PETROBRAS 20 · Under decommissioning · latitude -22.3591 · longitude -40.0891© OpenStreetMap
  • Under decommissioning1
  • Awaiting decommissioning0
  • Hibernation0
  • Decommissioned0
  • Operating0
  • Life extension0
  • Not provided0
1 ANP coordinates · no PDI supplement pointsSource: ANP panelSnapshot: Nov 27, 2026
Coordinates and statuses
Original coordinates from the ANP panel
PlatformStatusLatitudeLongitude
PETROBRAS 20Under decommissioning-22.3591-40.0891

Timeline

SOURCED EVENTS

A chronology of documented events.

Operation, production, approvals and destinations. Markers retain the precision stated in the source.

How to read this timeline

This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.

Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.

Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.

Today: 11/27/20261 platforms · 3 events on the axis · 0 periods without a single date
Documented events from 1975 to 2035, grouped by basin or operator
Platform
1975198019851990199520002005201020152020202520302035Today
Period without a single date
Under decommissioning
Review 3 events for PETROBRAS 20
PETROBRAS 20
ANP - public PDI
ANP - public PDI
ANP - Dynamic Panel for Decommissioning E&P FacilitiesSEI proceeding: 48610.218950/2023-31
—
Start of operationsProduction cessation, actualCessation forecast in the PDI · operator forecastPDI approvedRDI approved · No records in this selectionDocumented destination

One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.

ANP proceedings

SEI proceedingPDI / installationModalityStatusPDI approvalRDI approvalSource
48610.218950/2023-31PETROBRAS 20ExecutiveApproved8/24/2023Not providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 18NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 19NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 20NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 26NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 27NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 32NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 33NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 35NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 37NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026
48610.201673/2021-66PETROBRAS 47NormalClosedNot providedNot providedView source · Reviewed: 11/27/2026

Mass declared in the PDI

Mass declared in the PDI

Declared in the PDI
Mass in decommissioning condition (lightweight)
15,935.17 t
Public PDI source
Open PDI source
Page in the PDI
35
PDI retrieval date
11/27/2026

PDI observation: Semisubmersible built in 1983 and converted in 1992. The Marlim and Voador conceptual PDI (file page 39) reports 51,504 t for P-20, the same value it assigns to P-35; the value from the unit’s own executive PDI was adopted.

Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.

Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.

Declared mass; not recoverable steel.

Explore the connections

Campos Basin · Petrobras

Same field

Closest declared masses

Sources

Sources and method