Modern American Recycling Services Europe (M.A.R.S), Frederikshavn, Denmark
Towage from Brazil to Frederikshavn (M.A.R.S.) by Boskalis · Jun–Aug/2024
recycling
Boskalis — FPSO Fluminense towage project sheet · Reviewed: 11/27/2026Documentary record
FPSO Fluminense, FPSO operated by Shell, Campos Basin: decommissioned (ANP); 52,301 t declared in the PDI; documented recycling destination.
| Platform | Status | Latitude | Longitude |
|---|---|---|---|
| FPSO FLUMINENSE | Decommissioned | -22.6507 | -40.4273 |
Operation, production, approvals and destinations. Markers retain the precision stated in the source.
This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.
Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.
Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.
One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.
| SEI proceeding | PDI / installation | Modality | Status | PDI approval | RDI approval | Source |
|---|---|---|---|---|---|---|
| 48610.211925/2020-84 | FPSO FLUMINENSE | Executive | Approved | 4/9/2025 | Not provided | View source · Reviewed: 11/27/2026 |
PDI observation: Hull built in 1974, converted into an FPSO in 2003.
Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.
Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.
Declared mass; not recoverable steel.
Towage from Brazil to Frederikshavn (M.A.R.S.) by Boskalis · Jun–Aug/2024
recycling
Boskalis — FPSO Fluminense towage project sheet · Reviewed: 11/27/2026