Naval ObservatoryOffshore Brazil

Documentary record

FPSO Cidade de Niteroi

FPSO Cidade de Niteroi, FPSO operated by Petrobras, Campos Basin: under decommissioning (ANP); 47,177 t declared in the PDI; documented recycling destination.

Use in a study
Type
FPSOinferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
Field
MARLIM LESTEView source · Reviewed: 11/27/2026
Basin
CamposView source · Reviewed: 11/27/2026
Operator
PETROBRASView source · Reviewed: 11/27/2026
ANP status
Under decommissioningView source · Reviewed: 11/27/2026
Coordinates
-22.4966, -39.9374View source · Reviewed: 11/27/2026
Documented acronyms
Not providedView source · Reviewed: 11/27/2026

Location

Map of the 1 platforms in the ANP panelOriginal ANP coordinates; platforms in the PDI supplement are not shown on this map. Each point provides a name, status and coordinates.FPSO CIDADE DE NITEROI · Under decommissioning · latitude -22.4966 · longitude -39.9374© OpenStreetMap
  • Under decommissioning1
  • Awaiting decommissioning0
  • Hibernation0
  • Decommissioned0
  • Operating0
  • Life extension0
  • Not provided0
1 ANP coordinates · no PDI supplement pointsSource: ANP panelSnapshot: Nov 27, 2026
Coordinates and statuses
Original coordinates from the ANP panel
PlatformStatusLatitudeLongitude
FPSO CIDADE DE NITEROIUnder decommissioning-22.4966-39.9374

Timeline

SOURCED EVENTS

A chronology of documented events.

Operation, production, approvals and destinations. Markers retain the precision stated in the source.

How to read this timeline

This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.

Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.

Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.

Today: 11/27/20261 platforms · 3 events on the axis · 2 periods without a single date
Documented events from 1975 to 2035, grouped by basin or operator
Platform
1975198019851990199520002005201020152020202520302035Today
Period without a single date
Under decommissioning
Review 5 events for FPSO CIDADE DE NITEROI
FPSO CIDADE DE NITEROI
ANP - public PDI
IBAMA — public notice (2025)
ANP - Dynamic Panel for Decommissioning E&P FacilitiesSEI proceeding: 48610.220045/2022-61
MODEC — statement dated 30 June 2026
ANP - public PDIOperator forecast in the decommissioning plan. The passage of time does not turn a forecast into a completed event.
2026-05-08 a 2026-06-30+1Period without a single date · FPSO CIDADE DE NITEROI
FPSO CIDADE DE NITEROI · Period without a single date
MODEC — statement dated 30 June 2026
ANP - public PDIOperator forecast in the decommissioning plan. The passage of time does not turn a forecast into a completed event.
Start of operationsProduction cessation, actualCessation forecast in the PDI · operator forecastPDI approvedRDI approved · No records in this selectionDocumented destination

One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.

ANP proceedings

SEI proceedingPDI / installationModalityStatusPDI approvalRDI approvalSource
48610.220045/2022-61FPSO CIDADE DE NITEROINormalApproved1/28/2025Not providedView source · Reviewed: 11/27/2026

Mass declared in the PDI

Mass declared in the PDI

Declared in the PDI
Mass in decommissioning condition (lightweight)
47,177 t
Public PDI source
Open PDI source
Page in the PDI
27
PDI retrieval date
11/27/2026

PDI observation: Hull built in 1974, converted in 2008.

Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.

Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.

Declared mass; not recoverable steel.

Documented destination

Recycling facility in Denmark (not named in the announcement)

Departure from Brazil on 8 May 2026 and arrival at a recycling facility in Denmark; unit owned by MODEC · 2026-05-08 to 2026-06-30

recycling

MODEC — statement dated 30 June 2026 · Reviewed: 11/27/2026

Explore the connections

Campos Basin · Petrobras

Same field

Closest declared masses

Sources

Sources and method