Documentary record
Plataforma de Caioba 2 (PCB-2)
Plataforma de Caioba 2 (PCB-2), fixed platform operated by Petrobras, Sergipe Basin: under decommissioning (ANP); 1,292 t declared in the PDI.
- Type
- Fixed platforminferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
- Field
- CAIOBAView source · Reviewed: 11/27/2026
- Basin
- SergipeView source · Reviewed: 11/27/2026
- Operator
- PETROBRASView source · Reviewed: 11/27/2026
- ANP status
- Under decommissioningView source · Reviewed: 11/27/2026
- Coordinates
- -11.0005, -36.9249View source · Reviewed: 11/27/2026
- Documented acronyms
- PCB-2View source · Reviewed: 11/27/2026
Location
- Under decommissioning1
- Awaiting decommissioning0
- Hibernation0
- Decommissioned0
- Operating0
- Life extension0
- Not provided0
Coordinates and statuses
| Platform | Status | Latitude | Longitude |
|---|---|---|---|
| PLATAFORMA DE CAIOBA 2 | Under decommissioning | -11.0005 | -36.9249 |
Timeline
A chronology of documented events.
Operation, production, approvals and destinations. Markers retain the precision stated in the source.
How to read this timeline
This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.
Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.
Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.
One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.
ANP proceedings
| SEI proceeding | PDI / installation | Modality | Status | PDI approval | RDI approval | Source |
|---|---|---|---|---|---|---|
| 48610.234576/2023-11 | PLATAFORMA DE CAIOBA 1 | Executive | Approved | 2/23/2024 | Not provided | View source · Reviewed: 11/27/2026 |
| 48610.234576/2023-11 | PLATAFORMA DE CAIOBA 2 | Executive | Approved | 2/23/2024 | Not provided | View source · Reviewed: 11/27/2026 |
| 48610.234576/2023-11 | PLATAFORMA DE CAIOBA 3 | Executive | Approved | 2/23/2024 | Not provided | View source · Reviewed: 11/27/2026 |
| 48610.234576/2023-11 | PLATAFORMA DE CAIOBA 4 | Executive | Approved | 2/23/2024 | Not provided | View source · Reviewed: 11/27/2026 |
Mass declared in the PDI
Mass declared in the PDI
- Mass in decommissioning condition (lightweight)
- 1,292 t
- Public PDI source
- Open PDI source
- Page in the PDI
- 20
- PDI retrieval date
- 11/27/2026
PDI observation: The PDI reports 759 t (main structure) and 533 t (annex); the recorded value is their sum.
Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.
Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.
Declared mass; not recoverable steel.
Explore the connections
Same field
Closest declared masses
Sources
- ANP - Dynamic Panel for Decommissioning E&P Facilities · Reviewed: 11/27/2026
- pdi_ex_caioba.pdf · Reviewed: 11/27/2026