Documentary record
Plataforma de Atum 2
Plataforma de Atum 2, fixed platform operated by Petrobras, Ceará Basin: awaiting decommissioning (ANP). Source and date on every field.
- Type
- Fixed platforminferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
- Field
- ATUMView source · Reviewed: 11/27/2026
- Basin
- CearáView source · Reviewed: 11/27/2026
- Operator
- PETROBRASView source · Reviewed: 11/27/2026
- ANP status
- Awaiting decommissioningView source · Reviewed: 11/27/2026
- Coordinates
- -2.9617, -38.9759View source · Reviewed: 11/27/2026
- Documented acronyms
- Not providedView source · Reviewed: 11/27/2026
Location
- Under decommissioning0
- Awaiting decommissioning1
- Hibernation0
- Decommissioned0
- Operating0
- Life extension0
- Not provided0
Coordinates and statuses
| Platform | Status | Latitude | Longitude |
|---|---|---|---|
| PLATAFORMA DE ATUM 2 | Awaiting decommissioning | -2.9617 | -38.9759 |
Timeline
A chronology of documented events.
Operation, production, approvals and destinations. Markers retain the precision stated in the source.
How to read this timeline
This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.
Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.
Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.
One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.
ANP proceedings
| SEI proceeding | PDI / installation | Modality | Status | PDI approval | RDI approval | Source |
|---|---|---|---|---|---|---|
| 48610.234236/2025-52 | PLATAFORMA DE ATUM 1 | Executive | Approved | 9/4/2026 | Not provided | View source · Reviewed: 11/27/2026 |
| 48610.234236/2025-52 | PLATAFORMA DE ATUM 2 | Executive | Approved | 9/4/2026 | Not provided | View source · Reviewed: 11/27/2026 |
| 48610.234236/2025-52 | PLATAFORMA DE ATUM 3 | Executive | Approved | 9/4/2026 | Not provided | View source · Reviewed: 11/27/2026 |
Mass declared in the PDI
Mass declared in the PDI
- Mass (t)
- Not provided
- Public PDI source
- Not provided
- Page in the PDI
- Not provided
- PDI retrieval date
- Not provided
Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.
Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.
Declared mass; not recoverable steel.
Explore the connections
Same field
Sources
- ANP - Dynamic Panel for Decommissioning E&P Facilities · Reviewed: 11/27/2026