Naval ObservatoryOffshore Brazil

Documentary record

Petrojarl 1

Petrojarl 1, FPSO operated by 3R Petroleum, Santos Basin: status not reported by ANP (ANP). Source and date on every field.

Use in a study
Type
FPSOinferred from the name, cross-checked against ANP totalsView source · Reviewed: 11/27/2026
Field
ATLANTAView source · Reviewed: 11/27/2026
Basin
SantosView source · Reviewed: 11/27/2026
Operator
3R PETROLEUMView source · Reviewed: 11/27/2026
ANP status
Not providedView source · Reviewed: 11/27/2026
Coordinates
-24.1249, -41.8852View source · Reviewed: 11/27/2026
Documented acronyms
Not providedView source · Reviewed: 11/27/2026

Location

Map of the 1 platforms in the ANP panelOriginal ANP coordinates; platforms in the PDI supplement are not shown on this map. Each point provides a name, status and coordinates.PETROJARL 1 · Not provided · latitude -24.1249 · longitude -41.8852© OpenStreetMap
  • Under decommissioning0
  • Awaiting decommissioning0
  • Hibernation0
  • Decommissioned0
  • Operating0
  • Life extension0
  • Not provided1
1 ANP coordinates · no PDI supplement pointsSource: ANP panelSnapshot: Nov 27, 2026
Coordinates and statuses
Original coordinates from the ANP panel
PlatformStatusLatitudeLongitude
PETROJARL 1Not provided-24.1249-41.8852

Timeline

SOURCED EVENTS

A chronology of documented events.

Operation, production, approvals and destinations. Markers retain the precision stated in the source.

How to read this timeline

This timeline shows events, not the duration of decommissioning. The thin line only connects known events and never extends beyond Today.

Periods containing more than one date appear in the “Period without a single date” column, without a point or interval on the axis. Year-only and month-only dates do not receive an invented day.

Overlapping marks retain the source date. Use the event list next to the name to review each piece of evidence.

Today: 11/27/20261 platforms · 1 events on the axis · 0 periods without a single date
Documented events from 1975 to 2035, grouped by basin or operator
Platform
1975198019851990199520002005201020152020202520302035Today
Period without a single date
Not provided
Review 1 events for PETROJARL 1
PETROJARL 1
ANP - Dynamic Panel for Decommissioning E&P FacilitiesSEI proceeding: 48610.219467/2022-93
—
Start of operationsProduction cessation, actualCessation forecast in the PDI · operator forecastPDI approvedRDI approved · No records in this selectionDocumented destination

One marker per platform, SEI proceeding and approval date; repeated rows for the same proceeding do not multiply the event. A missing event means no date is provided in this source, not an absence of activity.

ANP proceedings

SEI proceedingPDI / installationModalityStatusPDI approvalRDI approvalSource
48610.219467/2022-93PETROJARL 1ExecutiveApproved1/25/2024Not providedView source · Reviewed: 11/27/2026

Mass declared in the PDI

Mass declared in the PDI

Not reported in the PDI
Not reported in the PDI
Not reported in the PDI
Public PDI source
Open PDI source
Page in the PDI
13
PDI retrieval date
11/27/2026

PDI observation: The PDI does not report lightweight; it reports displacement of 58,323 t and deadweight of 34,988 t, which are not equivalent to the mass of the unit.

Mass declared in the PDI does not automatically equal LDT, recoverable steel or a materials inventory.

Mass composition varies across PDIs: lightweight, transit-draft displacement or the sum of jacket and deck. Check the pages in the original document.

Declared mass; not recoverable steel.

Explore the connections

Santos Basin · 3R Petroleum

Same field

Sources

Sources and method