A data science framework for sustainable decommissioning: auditable inventories, material traceability and evidence-based decisions
Original title
Um framework de ciência de dados para o descomissionamento sustentável: inventários auditáveis, rastreabilidade de materiais e decisão baseada em evidências
Authors
Gabriel Gouveia Magalhães · Fernanda Baião · Paula Maçaira
Publication venue
Proceedings of the 2nd Scientific Symposium on Sustainable Decommissioning (COPPE/UFRJ), Even3, ISBN 978-65-272-2702-1
These works have not yet been published; titles, scope and publication venues may change.
Load-Level Physical-Financial Reconciliation in Marine and Offshore Decommissioning
Proposal submitted to the Offshore Technology Conference 2027 (Houston)
Proposta submetida à Offshore Technology Conference 2027 (Houston)
Ship and port urban mining for the energy transition
Mineração urbana naval-portuária para a transição energética
Application for the 19th MERCOSUR Science, Technology and Innovation Award, Young Researcher category
Candidatura ao 19º Prêmio MERCOSUL de Ciência, Tecnologia e Inovação, categoria Jovem Pesquisador
Simulation of segregation cost thresholds in port equipment decommissioning
Article in preparation for submission to a journal
Artigo em preparação para submissão a periódico
Journal version of the MRV-P protocol
Versão de periódico do protocolo MRV-P
In preparation
Em preparação
Consistency between global tailings inventories and historical mineral production
Consistência entre inventários globais de rejeitos e o histórico de produção mineral
In preparation
Em preparação
How to interpret the records
Reported
DWT, LDT and price transcribed from sales reports. The source provides the value reported for the transaction.
Documented
Identity, location and authorization supported by a document and date. Each scope requires its own verification.
Estimated
Material and route scenarios state their methods and assumptions. Verification requires operational evidence.
ANP · Offshore Brazil
Read on 11/27/2026
ANP — Dynamic Dashboard for Decommissioning of E&P Facilities
This snapshot preserves the inventory of platforms with approved PDIs and the process rows transcribed from the dashboard. It is a dated reading, with no automatic updates.
The ANP card shows 79 platforms; the table and map list 63 distinct platforms
Type inferred from the unit name
No mass (LDT), wells, pipelines, PAT or costs
Processes include onshore fields
Platform type was inferred from its name and checked against ANP totals. This classification is not an individual technical verification of the asset.
ANP registered status and SRLD reported destination are distinct concepts, kept in separate datasets and fields.
Platform inventory
63 distinct platforms across 6 basins. The dashboard card reports 79; this snapshot’s list and map contain 63.
Rows and processes
178 rows correspond to 138 distinct SEI processes. A process may appear in more than one row.
Published totals and dates
ANP cards report 98 approved PDIs and 35 approved RDIs. In the supplied rows, 96 processes have a PDI approval date and 18 have an RDI approval date. These counts have not been treated as equivalent.
A reading of ANP's public PDIs and public sources on destinations. Each statement retains its source, date and limitations.
The PDIs for Atum, Peroá, Merluza, FPSO Cidade de Angra dos Reis, P-31 and P-09 were not found in ANP's public arq/ppdi directory. This does not mean that these PDIs do not exist.
Platforms outside the table
ANP - PDIs published on gov.br/anp (arq/ppdi directory) · Read on 11/27/2026
They do not change the dashboard's official totals (63 in the table, 79 on the card): they are a supplement identified in public PDIs.
Type, field and owner as declared in the PDI; coordinates were not extracted.
Registered status unknown: the unit does not appear in the dashboard table.
Mass is outside the scope of this file (see massas-pdi.json).
ANP - PDIs published on gov.br/anp (arq/ppdi directory) · Read on 11/27/2026
"Completed": the date precedes the PDI version or is supported by a letter or order. "Forecast": the PDI was written before that date and it is an operator forecast.
A forecast is not a fact: the April 2023 PDI forecast a January 4, 2024 shutdown for FPSO Cidade de Santos, which appears as "Operating" in the ANP dashboard on November 27, 2026.
Page means the page of the PDF file, not the printed page number.
Boskalis, IBAMA, MODEC and Porto do Açu (one source per record) · Read on 11/27/2026
Only public sources with a URL are included; GSR field reports are excluded because they are internal.
P-32 (Estaleiro Rio Grande, Gerdau/Ecovix) and P-33's transfer to Estaleiro Rio Grande in 2026 are mentioned in press reports for which a URL has not been located; source URLs remain to be found.
"Preparation for decommissioning" at Açu does not establish a final destination.
ANP - Open data: forecasts of activities, investment and output during the production phase
Read on 11/27/2026
Observatory definitions
The strict definition adds the four activities with "Abandonment" or "Decommissioning" in their names. The expanded definition adds subsea equipment removal, environmental restoration and onshore facility removal. The site shows both and identifies the definition in use.
Strict definition
Permanent abandonment
Decommissioning - well severance
Decommissioning - production unit (UEP) demobilization
Decommissioning - line removal
Expanded definition
Permanent abandonment
Decommissioning - well severance
Decommissioning - production unit (UEP) demobilization
Decommissioning - line removal
Removal of other subsea system equipment
Environmental restoration
Removal of facilities associated with onshore production units
Limitations of the source and reading
Values declared by operators to ANP; they are neither actual expenditure nor Observatory estimates.
The open CSV files cover 2025–2029. ANP's dashboard provides forecasts through 2059; that series is not included in the open files.
Quantities use different units (wells in units, lines in km, restoration in km²): never add different units into one total.
The investment-by-basin file has no activity column; investment by basin therefore covers all activities only.
PAT/PAP: values declared by operators, limited to the open 2025–2029 dataset. The choice between strict and expanded definitions is the Observatory's and is explained on screen.
Timeline: only events dated in the source. The absence of an event means the source does not report one, not that nothing happened.
Analyses: status and type as recorded in the module's dataset; mass as declared in the PDIs.
Source files and supplied hashes
The SHA-256 hashes below were supplied with the data package. They do not represent a new verification of the remote files by the Observatory.
The European List and PDI readings are separate datasets, linked by the exact record name. Original SRLD and Offshore Brazil data are preserved.
European List · 15th edition
Commission Implementing Decision (EU) 2026/448 of 27 February 2026 — European List of ship recycling facilities, 15th edition
12 facilities matched: 11 listed and 1 not listed.
Capacity transcribed as published in the annex (LDT per year), including the FAYARD A/S value, which has a source footnote.
The validity dates for Green Yard AS and AF Offshore Decom have source footnotes.
The 15th edition removed three facilities (Harland and Wolff Belfast, Turun Korjaustelakka and Dortel Gemi Söküm); none are in the Observatory collection.
Absence from the list is not a rejection: the list is required only for ships flying the flag of an EU Member State.
Hong Kong Convention status was not verified in this reading.
Being on the European List does not remove the need for project-specific verification.
37 of 63 platforms with mass; 2 PDIs reviewed without mass
Sum declared in the file: 300,324.44 t. Platforms not yet reviewed: 24. PDIs reviewed without mass: 2.
This sum combines declarations with different mass compositions. It does not represent the total market, recoverable steel or a materials inventory.
Mass declared by the operator in the PDI; it is neither recoverable steel nor measured mass.
The mass composition varies across PDIs (lightweight, transit draft, sum of jacket and deck); see the mass label and observation.
Read from text extracted from the PDFs; verify the pages in the original documents before contractual use.
Without mass: platforms without a PDI in the ANP public folder (including 3R-4, 3R-5, Atum, Xaréu, Espada, Namorado, Cherne and Merluza).
Each record shows the mass label, observation, page and PDI link. The page for PETROBRAS 19 was not recorded in this reading; its mass remains identified as a PDI declaration.
Regulatory sources and legal limitations
A review of official instruments and guidance from regulators, governments and international organizations. Editorial summaries are translated; document names and links retain the original source.
This register organizes public sources and due diligence questions. It does not provide a legal opinion or certify the compliance of an asset or facility.
Applicability depends on the flag, asset type, location, destination, waste classification and operation date. International and national rules may apply concurrently.
Coverage is selective. A jurisdiction or document missing from this register does not mean there is no obligation. Confirm the consolidated text and project conditions with the authority and local legal counsel.
The consultation date records when the source was reviewed; it does not guarantee continuous updates. Regulatory changes are not monitored automatically.
This section does not change SRLD, ANP, PDI or European List records. Registry status, declared mass and authorization are distinct forms of evidence.